You don't have javascript enabled. Good luck with that.
Pencarian
80 Persen Turap Rusak di Jaktim Tertangani
.
photo istimewa - Beritajakarta.id

80 Percent of Damaged Sheet Pile in E. Jakarta Fixed

East Jakarta Administration continues to repair damaged sheet piles in East Jakarta in a bid to prevent overflowing of river and connecting channel (PHB).

Almost 80 percent of sheet pile was already repaired. If there is report from locals, we will immediately process it

Head of East Jakarta Water Management Sub-Department, Ahmad  Yazid Bustomi stated although some damaged sheet piles cannot be reached, but his side had repaired 80 percent of sheet pile.

Almost 80 percent of sheet pile was already repaired. If there is report from locals, we will immediately process it,” he uttered, Monday (10/19).

Kali Item River to Be Installed with Sheet Piles

The reparation is focused on areas that are prone damaged sheet piles, namely Utan Kayu Selatan, Matraman and Kali Baru connecting channel.

“We’re working on it, even though the budget is limited,” he disclosed.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1223 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1056 personAldi Geri Lumban Tobing
  3. First Jakarta Update Talks Nataru up to Water Tariff Adjustment

    access_time24-12-2024 remove_red_eye1050 personDessy Suciati
  4. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye912 personAldi Geri Lumban Tobing
  5. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye737 personFolmer